The LVNWSB Board of Directors and Management in a retreat for the development of the Board's 2017-2022 Strategic Plan

The CS National Treasury Hon. Henry Rotich (centre) together with PS Education Dr. Belio Kipsang (on his right) among other dignitaries during groundbreaking ceremony for the Kapkukto Community Water Supply Project in Elgeyo Marakwet County.

Lake Victoria North Water Services Board has received a Shs1.7 billion funding from the Belgium Government for the implementation of Vihiga Water Supply Project in Vihiga County.

LVNWSB top management in retreat for ISO 9001:2015 certification process

MOWI CS Hon. Eugene Wamalwa in groundbreaking of Khasoko Water Supply Project borehole

LVNWSB @10. Board celebrates ten years of excellent services provision.

Kakamega Water Supply System in Chepsonoi - Tindinyo

LVNWSB Chairman in donation of water tank to one of beneficiary institutions

A Solar powered water supply - LVNWSB has adopted such energy efficient supply systems

A team from the French Embassy with the LVNWSB CEO during review mission for the Kitale Water Supply Project

Latest News/ Updates

  • LVNWSB Chairman Joseph Lagat when he paid courtesy call to the Nandi County Commissioner
    LVNWSB Chairman Joseph Lagat when he paid courtesy call to the Nandi County Commissioner

    LVNWSB Chairman Joseph Lagat when he paid courtesy call to the Nandi County Commissioner

  • A water supply system for the Sengwers; The Kapcherop Water Supply Project
    A water supply system for the Sengwers; The Kapcherop Water Supply Project

    The indigenous people of Kapcherop Division


     

  • LVNWSB Chairman handing over Kabirirsang Water Project to the Nandi County government
    LVNWSB Chairman handing over Kabirirsang Water Project to the Nandi County government

    LVNWSB Chairman handing over Kabirirsang Water Project to the Nandi County government

  • Board shines in rural water supply
    Board shines in rural water supply

    It was another first for Lake Victoria North Water Services Board after being ranked the most improved Water Services Board in Kenya

  • Marathon
    Marathon

    The Cabinet Secretary, Ministry of Water and Irrigation Hon. Eugene Wamalwa joined the Lake Victoria North Water Services Board led by the Chairman Hon. Joseph Lagat and CEO

Moi’s Bridge –Matunda Water Supply System is in one of the flagship projects the Board had planned to rehabilitate under the Kenya’s Vision 2030 flagship projects during the year 2015.

The rehabilitation works which are expected to take three months is expected to increase capacity and supply to the urban center and the adjoining peri-urban areas upon its completion. Already the tender for the works have been awarded and the contractor has already moved to site for the works.

The scope of the rehabilitation exercise include refurbishment of the Intake Chamber located on River Nzoia, laying of new raw water gravity main of 150mm diameter GI pipe of approximately 30m long with associated fittings and masonry chamber.

The works will also involve laying of new 150 mm diameter ferrous pipe for raw water delivery approximately 24m long, completion of an elevated pressed treated water steel tank of approximately 145m3 located at Milimani area in Moi’s bridge. In addition, masonry tank of 225m3 one at Kware Primary School will also be repaired under the programme.The Site is located at Moi’s Bridge and Matunda towns of Kakamega and Uasin Gishu Counties. Meanwhile, the Board has planned to construct the first conventional sewerage treatment system in the area since sewerage system in the area ever since. Currently, residents in the area rely on pit latrines for sewerage treatments.